Precautions For Daily Maintenance Of Closed Cooling Towers

Precautions For Daily Maintenance Of Closed Cooling Towers

  1. After the closed cooling tower is deactivated, the water must be kept clean, especially the water in the pipeline. At the same time, there is sludge or other impurities at the bottom of the closed cooling tower, which also need to be treated. Naturally, on the closed cooling tower, you must check the filling materials, check whether the parts such as the printer nozzle are harmful, and if the damaged parts are damaged, you must immediately replace the damaged parts, and clean the impurities inside the filling. Check the aging problem of motor wires.
  2. In the process of completing the specific maintenance of the closed cooling tower, it is necessary to carry out corrosion resistance or maintenance solutions to the anti-rust paint or grease. At the same time as the specific processing is carried out, after corresponding solutions, it is very likely that the plastic film will be sealed, and the gear oil of the reducer will be stored in a closed manner and will be inspected in an all-round way. A full range of repairs can be achieved in this case, and protection and repairs need to be done in place of grease or anti-rust paint, which will allow for faster application.
  3. The closed cooling tower must carry out an all-round inspection for more than one month after it has been in operation for more than four months. Under such conditions, the gear oil needs to be replaced.

www.gwbrefrigeration.com

Get In Touch

Send Your Message