{"id":2615,"date":"2019-01-23T16:59:41","date_gmt":"2019-01-23T08:59:41","guid":{"rendered":"http:\/\/gewabin.wangluocloud.com\/?p=2615"},"modified":"2023-12-20T10:15:52","modified_gmt":"2023-12-20T02:15:52","slug":"the-significance-of-operation-and-maintenance-of-the-closed-cooling-tower","status":"publish","type":"post","link":"https:\/\/gewabintech.com\/es\/news\/company-news\/the-significance-of-operation-and-maintenance-of-the-closed-cooling-tower\/","title":{"rendered":"La importancia del funcionamiento y el mantenimiento de la torre de refrigeraci\u00f3n cerrada"},"content":{"rendered":"<p>Una vez finalizada la construcci\u00f3n de la torre de refrigeraci\u00f3n cerrada, es necesario someterla a una inspecci\u00f3n y a un proceso de aceptaci\u00f3n antes de que pueda entrar en funcionamiento, con el fin de detectar y resolver a tiempo cualquier problema. Adem\u00e1s, se debe prestar especial atenci\u00f3n a las dimensiones principales de la torre de refrigeraci\u00f3n cerrada y a la altura de cada componente. Adem\u00e1s de la instalaci\u00f3n y del equipo anticongelante, tambi\u00e9n se debe comprobar si la torre de refrigeraci\u00f3n cerrada cumple los requisitos t\u00e9cnicos de dise\u00f1o y construcci\u00f3n, y si la calidad de la instalaci\u00f3n es buena.<\/p>\n\n\n\n<p>Como las tuber\u00edas cerradas de entrada y salida de agua de la torre de refrigeraci\u00f3n, las zanjas para tuber\u00edas, los sumideros y los dep\u00f3sitos de recogida, as\u00ed como los accesorios de instalaci\u00f3n, las compuertas de vigas apiladas y otras condiciones. Al realizar la recepci\u00f3n de las torres de refrigeraci\u00f3n con ventilaci\u00f3n mec\u00e1nica, se debe prestar especial atenci\u00f3n a la calidad de la instalaci\u00f3n del ventilador, especialmente a que la l\u00ednea central y el equilibrado sean correctos, a que el \u00e1ngulo de instalaci\u00f3n de las palas del ventilador cumpla los requisitos y a que la holgura entre las palas y la carcasa del ventilador se mantenga dentro de los valores especificados por el fabricante. Antes de poner en funcionamiento la torre de refrigeraci\u00f3n cerrada, es necesario comprobar si quedan residuos en el sistema de refrigeraci\u00f3n tras la construcci\u00f3n y si se ha conectado el desag\u00fce de rebose; tambi\u00e9n hay que comprobar que las tuber\u00edas principales y auxiliares, as\u00ed como los filtros de los canales, las redes y los dispositivos de cierre est\u00e9n correctamente colocados.<\/p>\n\n\n\n<p>Cuando se llena por primera vez el dep\u00f3sito colector de una torre de refrigeraci\u00f3n cerrada, el nivel del agua debe alcanzar el nivel m\u00e1ximo. Una vez puesta en marcha la bomba de circulaci\u00f3n, debe suministrarse agua de forma continua desde el exterior hasta que todo el sistema quede lleno de agua. Al mismo tiempo, durante el proceso de llenado del sistema de circulaci\u00f3n, hay que tener cuidado de evitar que la bomba de circulaci\u00f3n se detenga debido a la bajada del nivel de agua en el sumidero de la torre de refrigeraci\u00f3n. Si es necesario vaciar las torres de refrigeraci\u00f3n durante las paradas invernales, se deben tomar medidas para evitar que se congele el agua de las tuber\u00edas, zanjas, pozos y sumideros.<\/p>\n\n\n\n<p>Si desea adquirir torres de refrigeraci\u00f3n cerradas de alta calidad, p\u00f3ngase en contacto con nosotros.<\/p>\n\n\n\n<p>JIANGSU GEWABIN HEAT TECHNOLOGY CO., LTD.<\/p>\n\n\n\n<p>Direcci\u00f3n: Distrito Norte, Zona de Concentraci\u00f3n Industrial, localidad de Wanshi, ciudad de Yixing, provincia de Jiangsu, China<\/p>\n\n\n\n<p>Tel.: 0510-87852861<\/p>","protected":false},"excerpt":{"rendered":"<p>After the closed cooling tower is completed, it must be checked and accepted before it can be put into production, so that problems can be found and dealt with in time. In addition, special attention should be paid to the main dimensions of the closed cooling tower and the elevation of each component. In addition to the installation and antifreeze equipment, it should also check whether the closed cooling tower meets the design and construction technical requirements, and the quality of the installation is good. Such as closed cooling tower inlet and outlet water pipes, pipe trenches, sinks and collection tanks, as well as installation accessories, stacked beam gates and other conditions. When accepting mechanical ventilation cooling towers, special attention must be paid to the installation quality of the ventilator, especially if the centerline and balance are correct, the installation angle of the fan blades meets the requirements, and whether the clearance between the blades and the fan casing maintains the values specified by the manufacturer. . Before the closed cooling tower is put into operation, it is necessary to find out whether there are any debris left in the cooling system during construction and whether the overflow sewer has been connected; it must also be checked, there are main and auxiliary pipelines and channel filtering. The position of the net and shut-off device is correct. When the closed cooling tower collecting tank is filled for the first time, its water level should reach the highest level. After the circulating water pump is put into operation, the water must be continuously supplied from the outside until the whole system is filled with water. At the same time, in the process of filling the circulation system, care should be taken to prevent the circulation pump from being interrupted due to the lowering of the water level in the cooling tower sump. If cooling towers need to be drained during winter shutdowns, take measures to prevent water in the pipelines, ditches, wells and sump from freezing. For high quality closed cooling towers, please contact&nbsp;us. JIANGSU GEWABIN HEAT TECHNOLOGY CO., LTD. Add: North District, Industrial Concentration Zone, Wanshi Town, Yixing City, Jiangsu Province, China Tel: 0510-87852861<\/p>","protected":false},"author":1,"featured_media":2616,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[12],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/gewabintech.com\/es\/wp-json\/wp\/v2\/posts\/2615"}],"collection":[{"href":"https:\/\/gewabintech.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gewabintech.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gewabintech.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gewabintech.com\/es\/wp-json\/wp\/v2\/comments?post=2615"}],"version-history":[{"count":1,"href":"https:\/\/gewabintech.com\/es\/wp-json\/wp\/v2\/posts\/2615\/revisions"}],"predecessor-version":[{"id":2617,"href":"https:\/\/gewabintech.com\/es\/wp-json\/wp\/v2\/posts\/2615\/revisions\/2617"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gewabintech.com\/es\/wp-json\/wp\/v2\/media\/2616"}],"wp:attachment":[{"href":"https:\/\/gewabintech.com\/es\/wp-json\/wp\/v2\/media?parent=2615"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gewabintech.com\/es\/wp-json\/wp\/v2\/categories?post=2615"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gewabintech.com\/es\/wp-json\/wp\/v2\/tags?post=2615"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}