Products

Contact Us

  • JIANGSU GEWABIN HEAT TECHNOLOGY CO.,LTD
  • Add: Industrial Concentration Zone (North) Of Wanshi Town, Yixing District, Wuxi, Jiangsu Province, China
  • Tel: +86-510-87852861
  • Fax: +86-510-87853861-801
  • Mob: +8613867612832
  • WhatsApp: +8613867612832
  • E-mail: Gewabin@163.com
Evaporative Condenser Cooling Tower

Evaporative Condenser Cooling Tower

  • Evaporative condenser cooling tower Introduction GWBB series closed evaporative condenser cooling tower uses water and air as cooling medium. It exchanges the heat with high temperature working fluid, the high temperature working fluid release heat into room temperature fluid. It has a water…

Cell phone:+86-13867612832‬
E-mail:gewabin@163.com

    Evaporative condenser cooling tower Introduction

    GWBB series closed evaporative condenser cooling tower uses water and air as cooling medium. It exchanges the heat with high temperature working fluid, the high temperature working fluid release heat into room temperature fluid. It has a water distribution system, cooling coils, inlet grille and so on.

     

    Detailed Images

    Evaporative Condenser Cooling Tower插图

     

    Evaporative Condenser Cooling Tower插图1

     

    Evaporative condenser cooling tower Advantage

    1.Softened water as the Frozen liquid, no touch the air, no metamorphism, no scaling and keep the best cooling effect.

    2.Low circulating water loss.

    3. There is water drift eliminator above the spray system, recycling water, recycling steam, save water.

    4. It easy change the place, the low operating cost, low maintenance cost

    5. Compact struction, small footprint, easy installation.

    6. Rare wearing parts, low malfunction, easy maintenance.

     

    Selection guide

    Evaporative Condenser Cooling Tower插图2

     

    1.The cooling water flow G=m3h

    2.Thetempeatue of inlet coling tower T1=℃

    3.The tempeatue of outlet coling tower T2=℃

    4.The calculation wet bulb temperature of installation location T=℃

    The heat rejction calculation od closed cooling tower

    Q=1.163xGx(T1-T2)

     

    Packing & Delivery

    Evaporative Condenser Cooling Tower插图3

     

    Packaging and Delivery

    Packing Details

    1.Two body parts: upper and bottom boxes.

    2.Packing with plastic film

    3.Shipped by one 40ft container. Upper and bottom body parts are separated in the same container.

     

    Delivery time:

    shipped in 30days after payment

     

    Our case

    Evaporative Condenser Cooling Tower插图4

     

    Hot Tags: evaporative condenser cooling tower, suppliers, manufacturers, customized, price, Cross Flow Cooling Tower factory, evaporative cooling towers, KHC Closed circuit type cooling tower, cooling tower with closed circuit, OEM Indirect Dry Cooling Tower, Counter Flow Closed Cooling Tower

Get In Touch

Send Your Message