Jiangsu gewabin heat technology Co,.Ltd
Cooling tower PVC fill Introduction Cooling tower PVC fill is one of the most important components for exchange of gas and water in cooling tower. The heat and resistance characteristic of the cooling tower PVC fill are the main factors influencing the cooling efficiency. Moreover the quality of…
Cooling tower PVC fill Introduction
Cooling tower PVC fill is one of the most important components for exchange of gas and water in cooling tower.
The heat and resistance characteristic of the cooling tower PVC fill are the main factors influencing the cooling efficiency. Moreover the quality of the material will influence the fill's lifetime.
Our company choose the high quality fill for the cooling tower. Cooling tower PVC fill is with the advantages of good chemical stability, resistant acid, alkali and organic solvent corrosion, high cooling efficiency, small ventilation resistance, strong hydrophilicity, large contact area, etc.
Cooling tower PVC fill details
Type: |
pvc filler pvc cooling tower filler |
Size: |
915/1220/1520mm(width), any length |
Material: |
PVC/PP |
Usage: |
For industrial cooling tower |
Temperature suitable: |
60℃ ~ -35℃ |
Color: |
carbon black, grey, etc |
Shaping mode: |
Plastic extrusion mould |
Brand Name: |
Gewabin |
Place of origin: |
Jiangsu,China |
Minimum Order: |
50pcs except custom shape cooling tower infill |
Packaging Details: |
In bundle, wooden pallets or as your request. |
Terms of payment: |
By T/T or Western Union, etc. |
Sample delivery time: |
15 days for spare parts |
Supply Ability: |
10000 pieces/day |
Production date: |
Within 7-10 days after your payment arrived |
PVC fills advantages:
1. which has the heat dissipation
2. good performance
3.Ventilated small resistance, durable, based on the easy and other advantages, it is widely used in different types of large, medium, small, cooling tower.
Our Services
1. Warranty: 1 Year warranty for all products.
2. Products Quality: 100% products inspection before delivery.
3. Just in time delivery: Normally, lead time is 10-15 days.
4. Customized Service: As we have our own molding department, customized service can be provided.
5. Prompt Customers Service: Trade Manager, Skype or E-mail will be replied in 24 hours.
Hot Tags: cooling tower PVC fill, suppliers, manufacturers, customized, price, PVC Cooling Tower Fill Packing, Cooling Tower Pvc Fill, Cross Flow Fill Sheet, Pvc Cooling Tower Fill Packing Media