{"id":2615,"date":"2019-01-23T16:59:41","date_gmt":"2019-01-23T08:59:41","guid":{"rendered":"http:\/\/gewabin.wangluocloud.com\/?p=2615"},"modified":"2023-12-20T10:15:52","modified_gmt":"2023-12-20T02:15:52","slug":"the-significance-of-operation-and-maintenance-of-the-closed-cooling-tower","status":"publish","type":"post","link":"https:\/\/gewabintech.com\/pt\/news\/company-news\/the-significance-of-operation-and-maintenance-of-the-closed-cooling-tower\/","title":{"rendered":"A Import\u00e2ncia da Explora\u00e7\u00e3o e Manuten\u00e7\u00e3o da Torre de Arrefecimento Fechada"},"content":{"rendered":"<p>Ap\u00f3s a conclus\u00e3o da torre de arrefecimento fechada, esta deve ser inspecionada e aprovada antes de poder entrar em funcionamento, para que eventuais problemas possam ser detetados e resolvidos atempadamente. Al\u00e9m disso, deve ser dada especial aten\u00e7\u00e3o \u00e0s dimens\u00f5es principais da torre de arrefecimento fechada e \u00e0 eleva\u00e7\u00e3o de cada componente. Para al\u00e9m da instala\u00e7\u00e3o e do equipamento anticongelante, deve tamb\u00e9m verificar-se se a torre de arrefecimento fechada cumpre os requisitos t\u00e9cnicos de conce\u00e7\u00e3o e constru\u00e7\u00e3o e se a qualidade da instala\u00e7\u00e3o \u00e9 satisfat\u00f3ria.<\/p>\n\n\n\n<p>Tais como tubagens fechadas de entrada e sa\u00edda de \u00e1gua das torres de arrefecimento, valas para tubagens, lavat\u00f3rios e tanques de recolha, bem como acess\u00f3rios de instala\u00e7\u00e3o, comportas de vigas empilhadas e outras condi\u00e7\u00f5es. Ao efetuar a aceita\u00e7\u00e3o de torres de refrigera\u00e7\u00e3o com ventila\u00e7\u00e3o mec\u00e2nica, deve ser prestada especial aten\u00e7\u00e3o \u00e0 qualidade da instala\u00e7\u00e3o do ventilador, nomeadamente se a linha central e o alinhamento est\u00e3o corretos, se o \u00e2ngulo de instala\u00e7\u00e3o das p\u00e1s do ventilador cumpre os requisitos e se a folga entre as p\u00e1s e a carca\u00e7a do ventilador mant\u00e9m os valores especificados pelo fabricante. Antes de a torre de refrigera\u00e7\u00e3o fechada entrar em funcionamento, \u00e9 necess\u00e1rio verificar se existem detritos remanescentes no sistema de refrigera\u00e7\u00e3o resultantes da constru\u00e7\u00e3o e se o esgoto de transbordamento foi ligado; deve-se tamb\u00e9m verificar se as condutas principais e auxiliares, bem como a filtragem do canal, a posi\u00e7\u00e3o da rede e do dispositivo de corte est\u00e3o corretas.<\/p>\n\n\n\n<p>Quando o reservat\u00f3rio de recolha da torre de arrefecimento fechada for enchido pela primeira vez, o seu n\u00edvel de \u00e1gua deve atingir o n\u00edvel mais alto. Ap\u00f3s a bomba de \u00e1gua de circula\u00e7\u00e3o ser colocada em funcionamento, a \u00e1gua deve ser fornecida continuamente a partir do exterior at\u00e9 que todo o sistema esteja cheio de \u00e1gua. Ao mesmo tempo, durante o processo de enchimento do sistema de circula\u00e7\u00e3o, deve-se ter o cuidado de evitar que a bomba de circula\u00e7\u00e3o seja interrompida devido \u00e0 descida do n\u00edvel de \u00e1gua no reservat\u00f3rio da torre de arrefecimento. Se for necess\u00e1rio esvaziar as torres de arrefecimento durante as paragens de inverno, devem ser tomadas medidas para evitar que a \u00e1gua nas condutas, valas, po\u00e7os e reservat\u00f3rio congele.<\/p>\n\n\n\n<p>Para torres de refrigera\u00e7\u00e3o fechadas de alta qualidade, contacte-nos.<\/p>\n\n\n\n<p>JIANGSU GEWABIN HEAT TECHNOLOGY CO., LTD.<\/p>\n\n\n\n<p>Morada: Distrito Norte, Zona de Concentra\u00e7\u00e3o Industrial, vila de Wanshi, cidade de Yixing, prov\u00edncia de Jiangsu, China<\/p>\n\n\n\n<p>Tel.: 0510-87852861<\/p>","protected":false},"excerpt":{"rendered":"<p>After the closed cooling tower is completed, it must be checked and accepted before it can be put into production, so that problems can be found and dealt with in time. In addition, special attention should be paid to the main dimensions of the closed cooling tower and the elevation of each component. In addition to the installation and antifreeze equipment, it should also check whether the closed cooling tower meets the design and construction technical requirements, and the quality of the installation is good. Such as closed cooling tower inlet and outlet water pipes, pipe trenches, sinks and collection tanks, as well as installation accessories, stacked beam gates and other conditions. When accepting mechanical ventilation cooling towers, special attention must be paid to the installation quality of the ventilator, especially if the centerline and balance are correct, the installation angle of the fan blades meets the requirements, and whether the clearance between the blades and the fan casing maintains the values specified by the manufacturer. . Before the closed cooling tower is put into operation, it is necessary to find out whether there are any debris left in the cooling system during construction and whether the overflow sewer has been connected; it must also be checked, there are main and auxiliary pipelines and channel filtering. The position of the net and shut-off device is correct. When the closed cooling tower collecting tank is filled for the first time, its water level should reach the highest level. After the circulating water pump is put into operation, the water must be continuously supplied from the outside until the whole system is filled with water. At the same time, in the process of filling the circulation system, care should be taken to prevent the circulation pump from being interrupted due to the lowering of the water level in the cooling tower sump. If cooling towers need to be drained during winter shutdowns, take measures to prevent water in the pipelines, ditches, wells and sump from freezing. For high quality closed cooling towers, please contact&nbsp;us. JIANGSU GEWABIN HEAT TECHNOLOGY CO., LTD. Add: North District, Industrial Concentration Zone, Wanshi Town, Yixing City, Jiangsu Province, China Tel: 0510-87852861<\/p>","protected":false},"author":1,"featured_media":2616,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[12],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/gewabintech.com\/pt\/wp-json\/wp\/v2\/posts\/2615"}],"collection":[{"href":"https:\/\/gewabintech.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gewabintech.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gewabintech.com\/pt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gewabintech.com\/pt\/wp-json\/wp\/v2\/comments?post=2615"}],"version-history":[{"count":1,"href":"https:\/\/gewabintech.com\/pt\/wp-json\/wp\/v2\/posts\/2615\/revisions"}],"predecessor-version":[{"id":2617,"href":"https:\/\/gewabintech.com\/pt\/wp-json\/wp\/v2\/posts\/2615\/revisions\/2617"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gewabintech.com\/pt\/wp-json\/wp\/v2\/media\/2616"}],"wp:attachment":[{"href":"https:\/\/gewabintech.com\/pt\/wp-json\/wp\/v2\/media?parent=2615"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gewabintech.com\/pt\/wp-json\/wp\/v2\/categories?post=2615"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gewabintech.com\/pt\/wp-json\/wp\/v2\/tags?post=2615"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}